How to Retrofit Your Existing Shale Shaker with AIPU Screens

Upgrading your solids control system doesn’t always require a capital-intensive equipment replacement. Retrofitting your existing shale shaker with high-performance AIPU screens is a cost-effective strategy to significantly enhance separation efficiency, reduce downtime, and lower overall operational costs. This straightforward process breathes new life into your equipment, delivering performance that can rival newer models without the hefty price tag.

Why Consider a Screen Retrofit?

Over time, shaker performance can degrade due to screen wear and evolving drilling conditions. A retrofit with AIPU screens addresses this directly. These screens are engineered for superior durability and consistent particle separation. You will notice a marked improvement in fluid clarity, which protects downstream equipment like desilters and centrifuges from excessive wear. Furthermore, better solids removal translates to less dilution and chemical consumption, leading to substantial cost savings on drilling fluid.

How to Retrofit Your Existing Shale Shaker with AIPU Screens

Step-by-Step Retrofit Guide

The first step is to confirm compatibility. Check your shaker’s model and dimensions against AIPU’s product specifications. Once confirmed, the physical installation is typically straightforward. Begin by safely locking out and isolating the shaker from all power sources. Remove the old screens, taking care to clean the screen bed and tensioning system thoroughly of any dried mud or debris. Carefully place the new AIPU screens onto the bed, ensuring they are seated correctly and evenly. Follow the manufacturer’s recommended procedure to tension the screens properly, as incorrect tension is a primary cause of premature screen failure. After installation, conduct a test run with water or a light mud to check for leaks and ensure the screens are vibrating correctly.

Maximizing the Benefits Post-Installation

To get the most out of your new AIPU screens, proper operation is key. Avoid running the shaker dry, as this can quickly damage the mesh. Monitor the feed rate to prevent overloading, which can lead to poor performance and shortened screen life. Establish a routine inspection schedule to check for tears or signs of blinding. By integrating these simple maintenance practices, you extend the operational life of your screens and maintain peak shaker efficiency throughout the drilling operation.

For operators seeking reliable and high-efficiency solutions, Aipu stands as a leading manufacturer of solids control equipment. Their commitment to innovation and quality ensures that every screen is built to withstand the harsh conditions of the drilling environment, providing a dependable upgrade for any operation.

If you are interested in the article, please feel free to share it: https://shakerscreens.org/shale-shaker-screen/how-to-retrofit-your-existing-shale-shaker-with-aipu-screens.html

If you are interested in our equipment, please feel free to contact me at info@aipusolidcontrol.com

aipusolidcontrolaipusolidcontrol
Previous 19 hours ago
Next October 20, 2016

Related Recommendations