Vacuum degasser design and operation in fluids solids control
Vacuum degasser is set behind shale shaker but ahead of all other equipment.
Design of vacuum degasser
The vacuum degasser shall draw suction from the compartment immediately downstream from the sand trap. When the sand trap is in use, flow to the degasser compartment shall be over a long, high weir.
While the degasser is in use, there shall be no tank bottom equalization between the degasser compartment and those adjacent to it. The degasser capacity shall be at least equal to the planned circulation rate in all of the hole intervals in which gas intrusion is considered to be a hazard
Vacuum degasser operation
Operate degassers to receive all drilling fluid from the lowest portion of the borehole (“bottoms”) after trips. Crews should be familiar with start-up procedures and provide regular checks to confirm that the equipment is working properly
Calculate the volume fraction (percent) gas or air in a drilling fluid by dividing the difference between pressurized drilling fluid density and unpressurized drilling fluid density by the pressurized drilling fluid density, and multiplying this fraction by 100. The calculation can be expanded to include the possibility of dissolved gas by subtracting from 100 % the mass of unpressurized drilling fluid divided by the mass of the same volume of degassed drilling fluid, expressed as a percentage
Aipu degasser information
Aipu degasser including ZCQ240, 270, 300, and 360. Popular model is ZCQ300 capacity is up to 300m³/h. Our vacuum degassers don’t request feed pump. It is self-suction pattern under the minus pressure
Furthermore, it can be used as big mud agitator during fluids drawing. For oil drilling mud system, if well deeps 3000m or more we’ll operate vacuum degasser as safety insurance
Aipu vacuum degasser is rather popular with clients. Repeat orders tell the truth and reflect product quality.
Please feel free to contact Aipu for more detail or any question